The mixer truck leaves the plant and the batching plant gives you cubic metres, not kilos. The tipper leaves the site without passing over any weighbridge. In both cases the electronic control document can still be issued. On 02/11/2026 the Ministry of Transport (Ministerio de Transportes) clarified that, if the exact weight is not known, it is enough to state the activity and another measure that allows the quantity to be estimated, and that the maximum authorised mass (MMA) is accepted if the vehicle is expected to be filled almost to capacity. Below you will find each case in a table, the steps to complete it before the lorry sets off, and what to do about empty trips.
What the regulation requires in the weight field
The data for the control document are set out in article 6 of Orden FOM/2861/2012 (the Spanish Ministry of Development order regulating the control document for road freight transport; BOE, Spain's Official State Gazette, of 05/01/2013). Section d) requires the nature and weight of the goods, and it already provided for another quantity where the weight is hard to determine. The clarifications issued in November bring that sentence down to the day-to-day reality of a plant or a quarry.
That data item is yours if you hire the lorry. Since Orden TRM/282/2026, in force from 29/03/2026, the contractual shipper is responsible for items a), b), c) and d), and the weight is in d). The actual carrier is responsible for the special authorisation, the date and the registration number. You can find the full breakdown in what data the control document must contain.
From 05/10/2026 this document must be electronic for public road freight transport (Ley 9/2025, eighth transitional provision). The way you fill in the weight stays the same with the new format: what changes is that you can no longer correct it with a pen in the cab.
What the Ministry has clarified for concrete, aggregates and earthmoving
The Ministry expanded its DeCA frequently asked questions with four queries, reported by Transporte al Día on 02/11/2026. These are the Ministry's interpretation criteria for the existing regulation, with no new order in the BOE. Applied to your work, they look like this:
| Situation at departure | What to enter in the control document |
|---|---|
| Aggregates weighed on the quarry weighbridge | The weight on the weighbridge ticket, which you already have |
| Ready-mixed concrete, using the batching plant data | The activity and another measure that allows the quantity to be estimated, such as the volume on the delivery note |
| Earthmoving with no weighbridge | The activity and a measure that allows the quantity to be estimated |
| Load that will fill almost the entire capacity of the vehicle | The maximum authorised mass (MMA) is accepted |
| Empty lorry | No DeCA needed |
| Empty lorry with pallets or containers to be delivered at the loading point | DeCA needed |
For concrete, this fits with what you were already doing. According to the ANEFHOP (the Spanish ready-mixed concrete association) note reported by Interempresas on 06/04/2026, in this sector the control document is equivalent to the delivery note, and the obligation affects only public transport. If the mixer truck is yours and carries your concrete, it is private complementary transport and does not need a DeCA; we explain this in the guide to private complementary transport.
The MMA is for loads that will fill almost the whole vehicle. If a four-axle lorry leaves half-loaded, entering the MMA leaves a figure that does not reflect the shipment, and that figure is the responsibility of whoever hires the transport.
How to fill in the weight on the electronic control document step by step
The decision is made once per product and per type of trip, so nobody has to improvise it at every departure in a rush. Do it like this:
1. List what you load
Note down each product and how it leaves: concrete by volume, crushed stone or sand by weighbridge, site earth unweighed. For each one, decide which figure you will use: actual weight, another measure with its unit, or the MMA when the trip is fully loaded.
2. Write the activity in the nature of the goods
When you are not entering the actual weight, the Ministry's clarification asks you to state the activity. A clear line is enough: “ready-mixed concrete HA-25”, “site excavation earth”. Whoever carries out an inspection needs to understand what is on the lorry and where the quantity comes from.
3. Enter the measure with its unit
Cubic metres, number of full trips or the vehicle's MMA, always with the unit written out. A bare figure without a unit raises doubts at a roadside check, and we cover this alongside other mistakes in common mistakes when filling in the control document.
4. Generate the document before departure
The PDF with its QR code must be in the driver's hands before the service begins, on a mobile phone or printed, according to the Resolution of the DGTCF of 05/06/2026 (the Spanish Directorate-General for Road Transport and Cableways; BOE of 12/06/2026). At a quarry that means at weighing; at a plant, when the mixer truck's delivery note is closed.
In DeCA the shipment is completed with origin, destination, goods and weight, and each item is validated before the document is generated. If you work with Gesthorm or Arigest, the quantity comes from the delivery note or weighbridge ticket you already produce, without typing it twice: we explain this on the digital delivery note page.

If at your plant the weight is only known once the mixer truck is loaded, in a short call we can look at how that figure gets from your delivery note into the DeCA, and you can try it with your own shipments: leave us your details and we will call you.
What happens if the quantity changes during the trip
A mixer truck leaves with a given volume and on site part is unloaded at one work front and the rest at another. Or the tipper that left with the MMA passes over a weighbridge again and the real figure is different. The Resolution of 05/06/2026 provides two ways to modify the document en route: the same PDF with the reason for the change, or a new PDF keeping the original. Handwritten annotations are not taken into account.
In DeCA, when you correct a document a new version is generated with the reason for the change; the previous one remains downloadable and is marked as superseded. You can see it in the video on how to correct a DeCA. If the trip has several unloads, also see how multiple loads or unloads are documented.

The lorry returning empty or with pallets
The Ministry's clarification settles a question that comes up every afternoon: an empty lorry does not need a DeCA. The exception is pallets or containers that it has to deliver at the loading point; in that case the return trip does need a control document.
If your warehouse or plant receives returned pallets from its customers, that trip has its own shipment with the goods “pallets” or “containers” and their quantity. The tipper that returns to the quarry with nothing on board leaves without a document.
Weight mistakes worth avoiding
- Entering the MMA out of habit on every trip, including those that leave half-loaded.
- Leaving the field as “0” or “pending” to fill in on arrival at the site.
- Writing the volume without a unit or without saying that it is ready-mixed concrete or earth.
- Correcting the weight on the printed paper: anything written by hand does not count.
- Sending a photo or a scan of the delivery note: the Resolution requires a natively generated digital PDF.
- Letting the lorry leave without checking that the QR code opens the PDF.
This last point has recent history. According to Fenadismer (the Spanish national federation of freight transport associations), the Directorate-General for Road Transport asked the autonomous communities to shelve the penalty notices for download failures on the control tablets between 05/10/2026 and 19/10/2026. That shelving covers only those cases and that period: the obligation and the penalty regime remain unchanged.
The lack of essential data in the control documentation is a serious infringement under article 141.17 of the LOTT (the Spanish Road Transport Management Act), with a fine of €401 to €600 (article 143.1.d), and each shipment counts as a separate infringement (article 138.3). We go into this in fines for not carrying the control document.
What to do this week at your plant or quarry
- Draw up the table of your products with the figure you will enter for each: weighbridge weight, another measure with its unit, or the MMA on fully loaded trips.
- Give it to whoever is at the weighbridge or the batching plant, and tell your regular hauliers so they know what they will see in the document.
- Check that the electronic control document is generated before departure and that the QR code opens the PDF from any mobile phone.
You will find more detail by sector on the pages for concrete transport and aggregates transport. DeCA costs €25 a month + VAT per company, with unlimited documents and users and no minimum commitment, and the first month is free with no card required; when it ends, nothing is charged automatically. Leave us your details and we will call you to go through it with your delivery notes.